Until now, Viimsi’s football and athletics enthusiasts did not have year-round training facilities. The new hall finally brings year-round training possibilities under one roof, including a full-size football field built to FIFA standards, running tracks, long jump and pole vault areas, a gym, and much more.
The building itself is designed as an insulated frame structure, equipped with solar panels on the roof. Water used in showers and sinks is given a second life by being purified and reused in the restrooms.
We are proud to be part of such a sustainable architectural project.
Contractor: Bildgren Ehitus
Architect: Tava Architectural Bureu
Photos by Kirill Masing